- Using the 400 during construction
- Demo old shelves
- Fills during construction
- Protection from wall demolition
- The wall is gone
- New air dryers
- New air handler — it's huge!
- Duct work installed
- New cooling water lines
- Look at that clean floor
- The new storefront
- Nitrogen arrives for the cooldown
- Where did all the dirt go?
- New pumps for cooling water
- The magnet arrives at the riggers
- The magnet arrives with the riggers
- Setting up the crane
- Two new water chillers on the roof
- Uncrating the magnet
- Prepping the air shaft for lift
- Connecting crane to magnet
- ...And, we're up!
- Up and over the building
- Across the roof
- Going down slowly
- 80 feet down the shaft
- Turning 8000 lbs. is tough
- Into the hallway
- Which direction does this thing go?
- Lifting
- Bolting the legs
- How's the vacuum?
- Cooling with Helium
- Lots of tanks to return
- Time to energize please don't quench
- Installed and running
- Magnet with cryobay
- Magnet with console